  • Location: Abu Dhabi, UAE
  • GFA: 43.000 m2
  • Date: 2020

WoB’s involvment in this project included creating a 5D BIM model based on the received IFC model, Cost data and construction programme. Our engagement included a presentation of diversities of usage while having a 5D model set up this way. To be able to showcase different scenarios, from the 5D BIM model, our team genereted three different 5D simulations, the first showing Actual vs Planned Simulation side by side, the second pre-construction simulation and the third focused on particular package, in this case a Glass Façade.